Safety Manager needed - Data Center Construction/Red Oak, TX

Code Red SafetyTexas, United StatesOn-sitePart-timeMid level, 2–5 yearsListed 1 day ago

Apply now

About this role

Code Red Safety is looking for a Safety Manager for a construction project in Red Oak, TX. This role will begin ASAP and work is anticipated to run for approximately 6 months working 50-60 hours per week. Local candidates only as there is no per diem available.

Applicants MUST meet the following requirements:

- Have 5+ years of field safety experience.

- Must have at least one of the following: OSHA 30, OSHA 510, OSHA 500, CSST, CHST, CSHO or similar

- Must be computer savvy

- Bilingual preferred

- Past electrical safety experience a plus

- Have a valid FA/CPR card.

- Must be able to pass a drug test & background check.

Code Red Safety specializes in placing qualified Safety Professionals into large industrial and commercial construction projects nationwide on a 1099 independent contract basis . If you meet the above qualifications, please apply. If you are determined to be a good candidate for this position, we will be in touch to discuss additional details.