About this role
Would you like to have a career with a collaborative, diverse, and dynamic mining company? We have an opportunity for you!
Our people’s division is growing, and we are looking to fill the position of Process Maintenance Planner/Document Control for our Cortez Processing operation. The successful candidate will administer the Maintenance and Process controlled documents.
At Nevada Gold Mines, our vision is to be the world’s most valued gold mining business by finding, developing, and operating the best assets with the best people. We are committed to a safe work environment, sending every person home safe and healthy every day and leaving a sustainable legacy on our host communities. We offer a generous benefits package which includes a competitive medical, dental, and vision plan with national provider networks, a 401k retirement plan with employer contributions, paid time off, company-sponsored medical clinics, company match share purchase program, and much more!
Position Description:
Nevada Gold Mines is looking to fill the position of Process Maintenance Planner/Document Control Specialist to join the team at Cortez process. This position will maintain the Cortez Process Document Control for the maintenance team with organizing, developing and maintaining all maintenance tactics and associated documentation, including SOP’s, SJP’s, LOTO documents, drawings, P&ID’s, and Single Line drawings .
Responsibilities:
- Organize, track, file and distribute accurate information in a timely manner .
- Manage controlled documents to ensure the latest, most current and accurate information is distributed to maintenance, operations personnel and contractors .
- Collaborate closely with the Maintenance, Operations, Environmental & Safety teams to ensure Livelink/Share Point documents are within the Nevada Gold Mines guidelines.
- Manage and maintain proper naming conventions, hierarchy structure, attributes and indexing of documents.
- Understand and follow Nevada Gold Mines document control standards.
- Format job plans, where maintenance work needs to be completed due to operational changes, statutory requirement changes or equipment improvements.
- Continuously review, seek feedback, and optimize resources, parts, tooling, task list, safety information, risk assessment related to SJP’s.
- Ensure routine maintenance SJPs, safety information, drawings and PM activities are accurately uploaded and maintained in SAP and in NGM Document Control.
- Successful candidates must be able to effectively collaborate and communicate with other operations, maintenance, Environmental and Safety personnel.
- Perform other duties as assigned.
Qualifications:
- Proficiency with Microsoft Office required
- Previous experience using SAP is preferred
- Demonstrated experience and proficiency in maintaining pumping and piping equipment as well as electrical and instrumentation equipment preferred
- Demonstrated ability to read and interpret blueprints and drawings preferred
- Excellent safety and attendance record required
What We Can Offer You:
- A comprehensive compensation package including a competitive medical, dental, and vision plan with national provider networks, a 401k retirement plan with employer contribution AND employer match, paid time off, company-sponsored medical clinics, company match share purchase program, and much more!
- Work in a dynamic, collaborative, progressive, and high-performing team.
- Endless opportunities to grow and learn with industry colleagues.
- Access to a variety of career opportunities across the organization.
- Nevada Gold Mines is committed to creating a diverse environment and is proud to be an equal opportunity employer.
About Nevada Gold Mines
Nevada Gold Mines is a joint venture between Barrick Gold Corporation (61.5%) and Newmont Goldcorp Corporation (38.5%), combining their significant assets across Nevada to create the single largest gold-producing complex in the world and realize the full potential of these mines through synergies and best-in-class operational improvements.
The massive mining operation comprises 8 mines along with their associated infrastructure and processing facilities that produced an estimated 4 million ounces of gold in 2018. Three of these assets are Tier One gold mines: Barrick’s Cortez; the combination of Barrick’s Goldstrike and Newmont Goldcorp’s Carlin; and the combination of Barrick’s Turquoise Ridge and Newmont Goldcorp’s Twin Creeks. In addition, Barrick’s Goldrush-Fourmile project has the potential to become the fourth Tier One asset in this portfolio. The new JV is expected to generate around $5 billion in cost savings over the next five years. Nevada Gold Mines is operated by Barrick.