About this role
SWJ Technology specializes in providing engineering, planning, and project management services across various industries. We are currently seeking a Project Schedule Manager / Construction Scheduler for a client in the automotive industry, specializing in car manufacturing. This role is a five-month (option to extent), project assignment, based in Blythewood , SC that requires onsite presence. If you’re eager to grow your career and make a meaningful impact on exciting projects, we look forward to your application.
PURPOSE:
The Project Schedule Manager / Construction Scheduler is responsible for developing, maintaining, and analyzing integrated construction schedules for a large-scale automotive manufacturing facility project. The role focuses on monitoring project progress, identifying schedule risks and delays, evaluating critical path activities, and supporting project management in maintaining project timelines. The position is planned as a part-time assignment at approximately 50% capacity.
RESPONSIBILITIES:
- Maintain and regularly update integrated construction schedules and key milestones.
- Collect contractor updates and validate progress against planned activities.
- Analyze dependencies, critical path risks, and schedule variances.
- Prepare look-ahead schedules and highlight activities requiring intervention.
- Coordinate recovery options with project management and construction contractors.
- Provide concise schedule dashboards and progress reports to stakeholders
QUALIFICATIONS:
- Bachelor’s degree in Construction Management, Civil Engineering, Mechanical Engineering, Project Management, or a related field preferred.
- Equivalent professional experience in construction scheduling or project controls may be considered in lieu of a degree.
- Proven experience in construction scheduling, preferably on industrial construction or major capital investment projects.
- Demonstrated experience supporting complex construction projects with multiple contractors and workstreams.
REQUIRED SKILLS:
- Working proficiency with Primavera P6, Microsoft Project, or equivalent project scheduling software.
- Solid understanding of Critical Path Method (CPM) and construction schedule analysis.
- Ability to evaluate schedule dependencies, milestones, progress, and potential delays.
- Strong analytical and problem-solving skills.
- Ability to interpret complex scheduling data and translate it into actionable management updates.
- Excellent organizational and time management skills.
- Strong communication and coordination skills when working with project teams and contractors.
- Ability to work independently and manage multiple scheduling priorities.
PREFERRED SKILLS:
- Experience supporting automotive manufacturing facility construction projects.
- Experience with large-scale industrial construction or greenfield/brownfield projects.
- Knowledge of construction delay analysis and schedule impact assessments.
- Experience developing and implementing schedule recovery plans.
- Experience reviewing and validating contractor schedules.
- Familiarity with project controls, progress measurement, and construction reporting processes
HOW TOPHYSICAL REQUIREMENTS:
- Work is normally performed in an office, laboratory, manufacturing floor, or machine shop setting where physical work includes, but is not limited to sitting, standing, reaching, kneeling, bending, and lifting up to 25 lbs.
- Must be able to understand and comply with all relevant safety practices .
FLSA STATUS/WORKING SCHEDULE:
- Location: Blythewood, SC
- Schedule: Part-time project assignment
- Duration: 5 months with option to extent
- Overtime: as required
- Assignment Start: ASAP
DISCLAIMER:
This job description is a high-level overview of general expectations of this position. It is not intended to list every responsibility of the position, nor does it represent an employment contract of any kind.
SWJ TECHNOLOGY and all of its subsidiaries (i.e., SWJ MACHINING and ProjectOne US) are Equal Opportunity Employers and all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, sexual orientation, gender, disability status, protected veteran status, or any other characteristic protected by law.