CHST needed - Data Center Construction/Cheyenne, WY

Code Red SafetyCheyenne, WyomingOn-sitePart-timeListed 1 month ago

Apply now

About this role

Code Red Safety is looking for a Safety Manager with a current CHST for a project in Cheyenne, WY. Work is already underway and this role will be added to the site ASAP. The project is anticipated to run for approximately 8 months. The standard work schedule is between 50-60 hours per week, however there could be significant overtime. Local candidates will have first consideration.

Applicants MUST meet the following requirements:

- Have 5-10 years of commercial construction safety experience

- Site requires on of the following BCSP certification: CHST, STS-C, ASP or GSP.

- In addition, must also have one of the following certifications: OSHA 30, OSHA 510, OSHA 500, CSSS, CSST, CSHO or similar

- Data Center construction experience a plus

- Must have a current FA/CPR

- Must be able to pass a drug test & background check.

Code Red Safety specializes in placing qualified safety professionals into large industrial and commercial construction projects nationwide on a 1099 independent contract basis. If you meet the qualifications, and are interested in the position, please apply. If you are determined to be a good candidate for this project, we will be in touch to discuss additional details.