Night Shift Field Safety needed - Data Center Construction/Eagle Mountain, UT

Code Red SafetyEagle Mountain, UtahOn-siteContractListed 5 days ago

Apply now

About this role

Code Red Safety is looking for a night shift Field Safety Tech to support a large construction project in Eagle Mountain, UT. This role will begin as soon as possible working 60-70hours per week (night shift 4p-2:30am). The contract is expected to run through December. Local candidates will have first consideration.

Applicants Must meet the following requirements:

- Must have 3-5 years of field safety experience

- Must have one of the following certifications: OSHA 30, OSHA 510, OSHA 500, CSSS, CSST, CSHO or similar

- Must have a current FA/CPR

- Must be able to pass a drug test & background check.

Code Red Safety specializes in placing qualified Safety Professionals into large industrial and commercial construction project nationwide on a 1099 independent contract basis . If you meet the qualifications and are interested, please apply. If you are determined to be a good candidate for this position, we will be in touch to discuss additional details.