Safety Manager needed - Data Center Construction/Pampa, TX

Code Red SafetyPampa, TexasOn-siteContractListed 4 days ago

Apply now

About this role

Code Red Safety is looking for a Field Safety Specialist to support a large construction project in Pampa, TX. This role will begin as soon as possible working 40/hrs per week on a day shift. The contract is expected to run through December. Only local candidates will be considered as there is no per diem available.

Applicants Must meet the following requirements:

- Must have at least 3 years of direct safety oversight experience as well as 8 years of relevant construction experience.

- Must have one of the following certifications: OSHA 30, OSHA 510, OSHA 500, CSSS, CSST, CSHO or similar

- Must have a current FA/CPR

- Must be able to pass a drug test & background check.

Code Red Safety specializes in placing qualified Safety Professionals into large industrial and commercial construction project nationwide on a 1099 independent contract basis . If you meet the qualifications and are interested, please apply. If you are determined to be a good candidate for this position, we will be in touch to discuss additional details.